Pulp & Paper Rejects Tank Construction

Pulp & Paper Rejects Tank Construction

Our customer in Virginia needed to replace a Rejects-AB Tank that was housed inside a building. This type of project is generally more difficult as our construction team has to work in a confined space and build the tank in sections, starting with the bottom, then the roof and support structure for the roof, and finally the tank shell while raising the roof to accommodate it.

Here are the major details of the project:

  • Complete custom design engineering
  • Multiple tank panels delivered to the site
  • Crew of 4 to 6 associates
  • Four week effort

Here’s some pictures of the build and installation process:

Arrow
Arrow
Slider

Have a pulp & paper rejects tank construction project? Contact Us Today!

Steel Tank Construction & Repair

API Above Ground Welded Steel Tanks


On-site installation of carbon steel, stainless steel, duplex, alloy & aluminum welded tanks for storage of fuel, water, chemicals and dry products as well as process tanks such as clarifiers, filtrate tanks, causticizers and others.

Learn More

Industrial ASME Pressure Vessels


ASME Section VIII Process Vessels and Tanks used in the petroleum, pulp and paper, chemical, and power generation industries. Complete custom design and construction to meet your facility’s unique requirements.

Learn More

Welded Tank Maintenance & Repairs


We’ll come to you! Full repair services on all types of tanks and pressure vessels or similar equipment. Repairs can include new bottoms, shell repair, roof replacements and more including indoor confined locations.

Learn More

Customized Engineering & Design


We offer complete in-house engineering for all tanks and vessels we build. Engineering and design capabilities include, but are not limited to, API 650, API 620, API 653, ASME Section VIII, AWWA D100, FM and NFPA.

Learn More


Contact Us Form

  • This field is for validation purposes and should be left unchanged.